Oriente
About us | Scrap Rails(R50- R65); Min - 12,500/30,000 Tons Per shipment, Max - As required by you. Quality and Quantity certificates will be issued by SGS. L/C conditions will be 100% payment at sight. Shipment time: Shipment within 45 Days of signing the contract. Size of the Rails:1/4 inch or over in thickness. Shipment: In Bulk Country of Origin: Eastern Europe. Pieces(ISRICode:200 - 202, No.1 HMS) not over 60 inches X 24 inches; 201, No.1 HMS) not over 3 feet X 18 inches 202, No.1 HMS) 5 Feet X 18 inches. Chemical Compositions of the goods: R50 - R51:67 KG/M - GOST 7173-75 C 0.67 - 0.8% Min 0.75 - 1.05% SI 0.13 - 0.28%, P max 0.035% S max 0.0456% Ar max 0.15% R65:64.72 KG/mm GOST 8165-75 C 0.6 - 0.82% Min 0.75 - 1.05% SI 0.13 - 0.28% P max 0.035% S max 0.0456% Ar max 0.15% Contains R50(51.67 KG/M GOST - 7173-75), R65(6472 KG/M GOST 8165-75) ISRI Code 200 - 202. Procedure of Sale: 1) Buyer will send LOI 2) Seller will send contract to buyer for signatures 3) Seller will sign contract and return hard copies to buyer 4) Buyer will open non-operative irrevocable, confirmed, sight L/C 5) Seller will provide 2% PBG which will make L/C operative from the date of issue of PBG. 6) Buyer may inspect the goods at the port of loading either before or during loading. 7) Shipment will be made within 45 days 8) Seller will arrange pre-shipment by SGS at the loading port. 9) After shipment, the seller will submit shipping documents to the bank for payment. |
---|---|
Industry Focus | Metal Waste |
Business Type | Agent |
Products/Services | floor, scrap rail |
Our Markets | Western Europe |
No. of Employees | 5 - 10 People |