PMC-101 Capillary Crystalline Waterproof Coating - PMC-101

PMC-101 Capillary Crystalline Waterproof Coating - PMC-101
:
Shenzhen JoaBoa Technology Co.,Ltd
: 2013-09-05 01:12:03
:
waterproofing coating, building materials, waterpr

Inquiry Supplier / Manufacturer
Description Of PMC-101 Capillary Crystalline Waterproof Coating - PMC-101

PMC-101 Capillary Crystalline Waterproof Coating - PMC-101 Specificaton & Trade Terms

ModelPMC-101
Place Of OriginChina
Price TermEX-Work
Payment TermT/T
Origin China
Model Number PMC-101
Brand Name JOABOA
Adhesion Excellent
Scrubbing Resistance Excellent
Water Resistance Excellent

PMC-101 Cement-based Capillary Crystalline Waterproofing Coating
Product Introduction



PMC-101 Cement-based Capillary Crystalline Waterproofing Coating is cement-based powdery waterproofing material with special active compound, which can penetrate into concrete matrix, making a chemical action with water continuously, and further generating water-fast Inert Crystalline to block and seal capillary pores of concrete. Besides, the active compound also can form into a penetration waterproofing layer, working with its own dense waterproofing coating layer, so that they compose two waterproofing layers featured with compact, high-strength, durability and reliability.




Product Features



Super permeability contributes to internal permeable crystallization of concrete, which is hard to be damaged.
Specially excellent "Self-healing" which fixes microcracks itself. It has long-term impermeability, and high resistance to high Hydraulic pressure. It falls into category of inorganic material, being out of the question of ageing and keeping lifetime as long as the concrete.
Resistant to frost heaving and thawing circulation, inhibiting alkali-aggregate reaction, preventing the concrete structures from chemical corrosion damage, protecting steel bars and without damage to concrete caused by expansion.
Non-toxic and environment-friendly products, which with excellent properties of temperature resistance, Humidity tolerance, oxidative resistance, carbonization resistance, ultraviolet resistance, radiation resistance.
Application is convenient and rapid, shortening construction period. Protective layer is no need after construction. Besides, comprehensive cost is lower.


Points for Attention



During construction, gloves, masks and safety goggles against dust are strongly recommended to be worn by workmen.
Keep ventilation at construction site, clean up hands after construction.
Construction is not a allowed if the temperature is lower than 5℃
It should be sealed and stored in the shade, ventilation and dry place.


Construction Requirements



Make sure the substrate is leveled, firm, clean, oil-stain-free, dust-free and without other contaminants. It is necessary to wet the dry substrates in advance and dry up by airing until without visual water.
Water-adding Proportion:
Shelling-out: 27% or so(6.5—7L water/25kg powder materials)

coating-squeegee :22% or so(5.3—5.8Lwater/25kg powder materials)



shelling-out with brush and roller for two layers on the treated substrates, make sure the total thickness reaches 1.0-1.2mm. Generally, the second shelling out is 3-4 hours later after the first film is dry.
The direction of the second brush should cross for the first brush.
Next construction should be after the prior film getting dry and solidify.


Storage and Transportation

Keep it in a dry place. Quality guarantee period is one year under standard condition. It can put into use further as long as it is qualified after testing even it is stored more than 1 year


Main Application

It is widely used on waterproof and protection of industrial and civil constructions like underground projects, metro, tunnels, pools and concrete structures of water conservancy projects.

Relative & Similar Product

Home  Product Directory  Company Database  Sourcing Leads  Sign In  Join Free  RSS  
© 2023 Business Directory, All Rights Reserved.