Listing ID#10221218
ModelPG 6541B
CategoryBoilers
PG6541B Gas Turbine Power Plant
Specifications
- Brand
- Meritek;GE; Alstom
- Origin
- China (Mainland)
Quick answer
PG6541B Gas Turbine Power Plant is a Boilers product. Key specs — Brand: Meritek;GE; Alstom; Origin: China (Mainland).
Product Description
- The two units were installed and operated in Nov. of 1997.
- Two units are on standby now. The units can dispatch electricity at any time.
- From 24th June 2007 to 26th June 2007, 3 continuous days dispatch electricity, and shut down until fuel was run out. And all the parameters are normal.
- One time rotor-turning every week according to operation manual.
- Fuel: #0 diesel oil.
- Operation Hours:Unit 1:5388 hours.
- Unit 2:4939 hours.
- Start-up Times:Unit 1:895 times.
- Unit 2:869 times.
- 2.Overhaul Status:
- Unit 1 in 2004 and Unit 2 in 2005, did medium overhaul. The cylinders were only opened without, because all the equipment are in good condition and then without any repair. There is overhaul report kept in files.
- Did daily maintenance.
- Inlet filters were replaced several times.
- Combustion liners and transition pieces had replaced already.